Skip to content

2026 State of the City Event Recap

City of Santa Maria · Member & Partner Briefing · October 13, 2026

State of the City

From Vision to Action — Summary of Key Updates

16,000+ housing units planned by 2045 under General Plan 2045
~24,000 jobs targeted by 2045, alongside 58,000+ new residents
800 jobs at the new Amazon last-mile facility on Stowell Road
–18% crime, Jan–Aug 2026 vs. same period in 2025
$25M→$13M structural budget deficit, reduced this fiscal year
35 yrs of adequate water supply per the newly adopted Urban Water Management Plan

Presented by Mayor Alice Patino · City Manager David Rowlands · Chenin Dow · Brett Fulgoni · Shad Springer · Chief Christopher Williams · Chief Brad Dandridge · Allan Hancock College, Santa Maria

"Our goal is growth with purpose, creating opportunities, strengthening neighborhoods and preserving the quality of life that makes Santa Maria home."

Mayor Alice Patino
01

Growth & General Plan 2045

Mayor Patino · Chenin Dow
16,000+ housing units
58,000+ new residents
~24,000 jobs
~5,500 units in the pipeline today
  • On track for state housing goals: about one-third through the RHNA cycle, with about one-third of the goal met. ADUs are the most consistent growth type; single-family growth is minimal.
  • Why annex: infill and vacant land are running out, and what remains is largely conservation land. 985 acres east of Highway 101 are proposed for annexation.
  • Land math: of 985 proposed acres, approximately 605 go to roads, utilities, public safety, homes and jobs — plus 2 high schools, 2 junior highs, and 6 elementaries.
  • Parks today: about 3 acres per 1,000 residents, against a masterplan target of 5. The sports complex at Depot/Stowell started at $6.5M and is now expected near $20M.

"We cannot wait until homes are built to figure out where schools, parks and public safety facilities go. We have to plan for those now and from the beginning."

Mayor Alice Patino

"These are not just plans, these are turning into action."

Chenin Dow Director of Community Development, on the housing pipeline

Housing Projects Underway or Recently Completed

Planned community (vacant land)~1,500 units
Las Brisas (market-rate, completed + townhomes)340 + ~100 for sale
Perlman Apartments (affordable, breaking ground soon)150 units
Heritage Walk Lofts (downtown, under construction)100+ units
Self-help ownership homes (workforce households)49 units
55+ ownership housing near the hospitalUnderway
02

Downtown Revitalization

Mayor Patino · Chenin Dow
  • Former Sears: becoming an El Super grocery store with added commercial space; opening expected later this year.
  • Former Mervyn's building: Heritage Walk Lofts — 100+ loft-style apartments, now under construction.
  • Next up: Perlman Apartments (150 affordable units at Broadway and Main), then Alvin Newton Apartments (market-rate with ground-floor commercial next to Bank of America).
  • $2.1M state REAP grant funds the downtown sewer line — essential for any new residential or commercial building downtown.

"Having plans on a shelf isn't enough. We wanted to create real opportunities for development and turn those plans into projects that would benefit the community."

Mayor Alice Patino

"I can look out my office window every day and see the progress on that."

Chenin Dow Director of Community Development, on Heritage Walk Lofts

Downtown Milestones — From Plan to Projects

2008Formal downtown plan approved
2015Downtown specific plan updated
2019Streetscape plan built with the community
2020City and Chamber invite developers (RFPs)
20214 proposals received for City parcels
2026Construction: El Super, Heritage Walk Lofts, Perlman next
03

New Business & Economic Development

Chenin Dow
Amazon — Confirmed 800 jobs
Last-mile delivery facility on Stowell Road. Announced publicly for the first time at this event.

"This is the first time we can say publicly that it is an Amazon facility. It represents 800 jobs for residents of our community."
— CHENIN DOW
  • New and coming businesses: Sprouts Farmers Market, El Super, Men's Wearhouse, Freddy's Frozen Custard & Steakburgers, 5 Cities Swim School, Hyundai of Santa Maria showroom.
  • Vandenberg effect: Supporting companies are looking at Santa Maria as a place to locate, and existing businesses are growing. Santa Maria is about 25% of the Central Coast's population.
  • Opportunity Zones: New federal designations proposed, with submission to the IRS expected October 28.
  • Auto sales matter: A key part of City revenue — the new Hyundai of Santa Maria showroom is notable for that reason.

Financing Tools Now Available to Developers

SCIP (via CSCDA)30-year low-interest bonds for streets, sewers, public improvements
BOLD (via CMFA)Similar 30-year bond financing for public improvements
Open PACEProperty-assessed financing for energy-efficient upgrades
HEROProperty-assessed financing for energy-efficient upgrades
04

Streets & Transportation

Brett Fulgoni

Paving Pace — Share of City Paved Per Year

This year (every ~100 yrs)1%
Next year (every ~50 yrs)2%
Goal (every 25 yrs)4%

Road AI Street Survey — Cost Comparison

Old method (¼ of city)$150K
Road AI (whole city)$10K
  • About 80 lane miles resurfaced last year. A new in-house crew handles local streets; contractors take major arterials.
  • ~$10M in contracted work next: West Taylor; Miller (Main to Donovan); College (Chapel to Donovan); Donovan (College to Carlotti); Industrial Parkway.
  • In-house paving expected to cost $800K–$1M/year in materials.
  • Smart signal pilot on Cook Street: adaptive signals time lights to traffic and help late buses and emergency vehicles. If successful, goes citywide.
  • Highway 135 interchange ($90M), construction expected 2029. Highway 101 project follows in 2032.

"Our focus is and remains our arterials and collectors. The roads that handle the most traffic, they handle the most commerce."

Brett Fulgoni Director of Public Works
05

Water, Wastewater & Solid Waste

Shad Springer
$500M+ wastewater plant upgrade (state-mandated; serves city 50+ years)
35 yrs of adequate water supply per the new Urban Water Management Plan
1,200 ft deep — first City well drilled in 30 years
~19,000 t recycling + organics diverted from landfill each year
  • Water supply: Groundwater wells and State Water meet demand of ~12,000–13,000 acre-feet a year. The new well reaches deep for quantity and drinking-water quality.
  • Basin levels are lower in drought but not at historic lows. Twitchell Reservoir recharges the basin through the Santa Maria River.
  • Wastewater plant: Master plan goes to Council by year-end. City is pursuing outside funding so the cost doesn't fall only on ratepayers.
  • Landfill: Cell expansion adds ~8 years of capacity. Gas is captured to generate renewable electricity.

A Lean Utility

Utilities employees~130
Annual operation~$100M
Employee-to-resident ratio~1:1,000
Sewer line cleaned per year260 miles

"The city has adequate water supplies to meet the planning needs for the next 35 years."

Shad Springer Director of Utilities
06

Public Safety

Chief Williams · Chief Dandridge

Police — The Trend Is Down

Shooting incidents, 2024→2025–51%
Crime, Jan–Aug 2025 → 2026–18%
Crime trend since 2022Declined every year
181 illegal firearm arrests in 2025
~0 officer vacancies after current recruit class (was 30+)
  • Gang unit reinstated in early 2025; credited with the drop in shootings alongside a focus on removing illegal guns.
  • 100 license plate readers — data shared only within Santa Barbara County; every search logged and audited.
  • Coming in 2027: red-light camera pilot, drone first-responder program (to Council in November), narcotics task force.

Fire — By the Numbers (2025)

Total incidents13,000+ (+6%)
Structure fires50+ (~1/week)
Fire investigations109 (~1 every 3 days)
Arson arrests12
Training hours21,000+ (~3,000 certifications)
Community outreach10,000+ residents, 87 events
Minimum staffing (daily)23 firefighters

"This improvement doesn't just reflect better fire protection, it also lowers insurance costs for residents and businesses across the city."

Chief Brad Dandridge On the improved ISO rating — among top performers in the state
07

Budget & Measure C

City Manager Rowlands

Structural Deficit — This Fiscal Year

Before cuts$25M
After cuts$13M
Measures taken50 positions eliminated or frozen
Library hours reduced–8 hrs/week

General Fund Reserves ($42M projected vs. $53.9M target)

Operating$23M
Emergency (formerly LEAF)$9M
Section 115 trust$8M
Contingency$2M
Gap to target$11.9M
Measure C — Nov. 3 Ballot
8.75% sales tax today
→
9.25% if approved
~$13M per year, stays local. 50¢ per $100 taxable purchase.
Exempt: groceries, hygiene products, prescriptions.
Non-residents who shop here also pay.

Where Measure C Would Go (Intended Priorities)

Parks & playgrounds Paul Nelson Aquatic Center Streets & sidewalks Library Elwin Mussell Senior Center Veterans' Memorial Building Minami & Grogan Community Centers Youth programs Senior programs LED sports lighting

10 of 22 playgrounds need replacement.

"Measure C is not a substitute for sound fiscal management. It does not mean giving the City a blank check."

David Rowlands City Manager
  • Accountability: An annual spending plan, public expenditure reports, an oversight committee appointed by the Mayor and Council, and independent audits. Revenue stays local and can't be taken by the state.
  • Timing: If approved, partial revenue arrives June–August 2027, then monthly.
  • Track record: In 2012, voters approved a quarter-cent tax for police, fire, youth and the library with 74% of the vote. The Mayor said the City delivered on what it promised.
09

What's Ahead: Key Dates

Oct. 28
Opportunity Zone designations expected to be submitted to the IRS
Nov. 3, 2026
Measure C on the ballot — half-cent sales tax, ~$13M/yr for City services
November
Drone first-responder program goes to City Council
Late 2026
El Super expected to open · Wastewater master plan to Council · Perlman Apartments break ground
2027
Red-light camera pilot; narcotics task force; paving pace rises to 2%; drone program running by end of Q1
Jun–Aug 2027
First Measure C revenue (if approved)
2028
License plate reader contract up for renegotiation
2029
Highway 135 interchange construction begins · $90M project
2032
Highway 101 project
2045
General Plan horizon — 16,000+ homes · 58,000+ residents · ~24,000 jobs

What It Means for Business

The Chamber's Read
01

Jobs are outpacing workers

800 Amazon jobs and a 24,000-job target put workforce pipelines with Allan Hancock College and the Santa Barbara County Workforce Development Board front and center.

02

Capital tools are on the table

SCIP, BOLD, Open PACE, HERO and proposed Opportunity Zones can close financing gaps for development and building upgrades.

03

Watch the cost of growth

Updated development impact fees and a $500M+ wastewater upgrade will shape project budgets and utility rates for years.

04

Safety trends help recruitment

Falling crime and an improved fire ISO rating strengthen the case for locating here and can help lower insurance costs.

05

Healthcare needs a convener

The City named the Chamber as a partner on physician recruitment — a natural convening role for the business community.

06

Measure C is on the Nov. 3 ballot

It would raise about $13M a year for City services and facilities. If it passes, first revenue would arrive in mid-2027.

"Santa Maria has a plan. We have challenges. We have opportunities. Most important, we have a community capable of meeting the moment."

Mayor Alice Patino
About this summary. Prepared by the Santa Maria Valley Chamber from the 2026 State of the City, held October 13, 2026 at Allan Hancock College. All figures are as presented by City of Santa Maria speakers. Quotes come from the event recording and are lightly edited for transcription errors and clarity. Thank you to Allan Hancock College for hosting, and to City leaders for their time.

The Santa Maria Valley Chamber is committed to fostering a thriving, inclusive, and resilient community by leveraging resources, strengthening partnerships, and promoting economic vitality. santamaria.com